Published: 3 July 2024
We are in the final stages of a bathroom and seperate toiler refresh. We have new vanity, bath, plumbing, floor tiles in place, but need existing tiled walls (bathroom) and 1/2 tiled, 1/2 gib walls (toilet) painted to complete the refresh. Tiles will need some filling in certain places as the refresh has left some holes. Rooms will need the new fittings covered and the floor before painting. Bathroom and Toilet shown prior to new installs completed.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
4.0
|
Communications |
5.0
|
Prakash was brilliant to deal with, exceptionally clear communication and adhered to very high standards. Was committed to the work and did such a good job we extended the contract into other areas while on site. Highly recommend, very thorough and professional.
Work carried out by the owner/operator
Reviewed on 25-07-2024
Tradesperson reply
"Thank you so much Cam"
Partner with Builderscrack
Get work