Preparation and painting the white section of the house front, weather boards, around windows etc. Possibility a scaffold required - at least a ladder - for the upper reaches. It is a single storey though the ground is lower this side of the house than at the back.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
A real pleasure to have Dave working on our house. He was friendly and focused and kept in contact throughout. He was even better than his promised schedule and I was really happy with his work. He was careful also over detail.
Work carried out by the owner/operator
Reviewed on 10-02-2021
Tradesperson reply
"fantastic client,, job went smooth"
Partner with Builderscrack
Get work