barge boards need prep & paint. paint plaster at same time. on Gable ends. potentially some dormer work . small but double storey house. Paint verandah ground floor.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
would use Kris again when/if needed.
Work carried out by the owner/operator
Reviewed on 12-01-2021
Tradesperson reply
"Thanks was a pleasure to be of assistance"
Partner with Builderscrack
Get work