The table was delivered with paint flaking and needs to have this removed and another coat of paint (white ) applied. The legs potentially will need to be sandblasted and an appropriate concrete paint applied . The table is fixed and bolted in a school playground
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
The job was completed using quick and timely communication and right on time. Excellent.
Work carried out by the owner/operator
Reviewed on 16-12-2019
Partner with Builderscrack
Get work