N.B. Scaffolding needed for work. Full and careful preparation for two storied weatherboard house situated on a sloping section. Wood in good condition. This job includes painting barge boards, window frames , 3 finials as well as upper weatherboards. Lower weatherboards as additional work can be discussed. Time frame: as soon as possible.
#1 | Tradie 1 |
|
255 jobs | No longer in contact |
#2 | Tradie 2 |
|
7 jobs | No longer in contact |
#3 | Tradie 3 |
|
81 jobs | No longer in contact |
#4 | Tradie 4 |
|
12 jobs | No longer in contact |
#5 | Tradie 5 | No recent reviews | 7 jobs | No longer in contact |
Partner with Builderscrack
Get work