We have a Wendy house that we want to move from one side of our playcentre to the other. It’s currently balanced on two timber sleepers on our soft fall surface, and we want to move it onto the grass about ten meters away, and the timber sleepers will need to be repositioned, the ground may require a small amount of leveling. I’m not sure if the timber sleepers are treated timber, they may need to be replaced. In the past the Wendy house was moved and it took 10 people to move it- we’re hoping that stronger professionals would do the job more efficiently! The Wendy house is roughly 3mx2m. We ideally want the house moved as soon as possible, and the centre is child-free mon, wed, thurs & fri afternoons (1:30 onwards) so would prefer the work to be done during this time.
#1 | Tradie 1 |
|
4 jobs | No longer in contact |
Partner with Builderscrack
Get work