Published on 11th May 2026
remove existing and Install 2 external lig --- supplied , weatherboard needs 2 packers
Supply and install 2 x external white downlights in porch
Check and fix internal power point
remove exterior light and make safe
Run electric from house to shed ( approx 11-12m)
please quote per job
| Quality of work |
5.0
|
The quality of workmanship provided |
| Cost |
5.0
|
How well they kept to the quoted cost |
| Schedule |
5.0
|
How well they kept to schedule |
| Communications |
5.0
|
Their professionalism and responsiveness |
"Olly is fast , knowledgeable and nothing is a problem , very friendly and trustworthy as a person"
Work carried out by the owner/operator
Review posted by Clive on 3rd June 2026
Verified work review
Partner with Builderscrack
Get work