To lay a pipe from downpipe, along back of garage (to be linked up to another drain). Then to pave over the area with large pavers matching another area. The area is 3.8m at its widest width and roughly 5.5m long. This is step 2 of 3 parts and is dependent of a fence being built first.
Partner with Builderscrack
Get work