Active job

Quote for Trench

Job description

Landscape Design
Wellington

Need a trench Dug for new gas pipes to be layed. Trench length 75M long and 300 wide. 800 Deep, soft sand will need to be laid under the pipe. Once pipe is layed trench needs to be filled by the same contractors who dug the trench. At this stage will need quotes only. This will be going up an existing drive way of p metal, ground level is hard dirt.


Trade professionals

#1 Tradie 1 Not reviewed 0 jobs No longer in contact
#2 Tradie 2 No recent reviews 25 jobs No longer in contact
#3 Tradie 3 No recent reviews 6 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo