Need a trench Dug for new gas pipes to be layed. Trench length 75M long and 300 wide. 800 Deep, soft sand will need to be laid under the pipe. Once pipe is layed trench needs to be filled by the same contractors who dug the trench. At this stage will need quotes only. This will be going up an existing drive way of p metal, ground level is hard dirt.
#1 | Tradie 1 | Not reviewed | 0 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 25 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 6 jobs | No longer in contact |
Partner with Builderscrack
Get work