We are after someone to assembly and install a spring free trampoline. The ground will need to be leveled (soft soil) it’s in an area of a new raised garden, the retaining wall is in place, soil there, just needs to be leveled. Some existing plants may need to be removed and branches trimmed on a small tree to make space.
#1 | Tradie 1 | No recent reviews | 2 jobs | No longer in contact |
#2 | Tradie 2 |
|
61 jobs | No longer in contact |
#3 | Tradie 3 |
|
25 jobs | No longer in contact |
#4 | Tradie 4 |
|
46 jobs | No longer in contact |
Partner with Builderscrack
Get work