Lookimg for quotes and timefrsme of when the following work can be done. 1. Re contour partly formed metal parking area and top up with new metal for parking. 2. Shape a 5m wide portion of backyard with gental fall away from house to a slight dished drain to outer edge which should provide fall for water run off either two ways around the house or all fall in one direction. Add metal for parking approx half in metal other half soil to be spread for grass. 3 Spread onsite top soil to areas around house.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
4.0
|
Communications |
4.0
|
Very happy with works done.
Reviewed on 19-08-2022
Partner with Builderscrack
Get work