-House piling for 65sq m second dwelling (house made offsite by others) Piles 1.5m deep based on geotechnical. LBP sign of required - pole retaining walls up to 1.8m height - excavation work associated with the second dwelling. Cut Material to be kept on site. - Building consent is in the final stages or processing. Work to get underway in approx 3-4 weeks upon the consent being issued. Vegetation has been removed and stumps have had a deep grind in preparation for work to get underway. I’m after someone who can take the lead on the work above