We need the rear yard part of our section prepared to lay pavers. This will require removal of soil, to correct level, laying base and compacting. The yard is approx 70 square Meters, and as seen in the photos largely flat. We require the finished paver height to be the same as the existing concrete paths. There is access to the road for machines up to 1.7m wide
#1 | Tradie 1 |
|
55 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 19 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 46 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 2 jobs | No longer in contact |
#5 | Tradie 5 |
|
67 jobs | No longer in contact |
#6 | Tradie 6 |
|
83 jobs | No longer in contact |
#7 | Tradie 7 | No recent reviews | 174 jobs | No longer in contact |
#8 | Tradie 8 |
|
37 jobs | No longer in contact |
Partner with Builderscrack
Get work