We are looking for a solution for the transition from our main deck to our rear section. We are getting the rear section dug out and wish the rear section to be as level as possible. The large hill/slope will be removed within our rear section (not required to be included in quote) the problem we have is going from the existing deck to the rear section including where the current retaining wall stops. The Job will be a little bit of landscape design and then making the two areas meet up nicely etc
#1 | Tradie 1 | No recent reviews | 36 jobs | No longer in contact |
Partner with Builderscrack
Get work