New shed build requires grounds / driveway completion. Metal has been put down but more is required to finish and some top soil needs to be leveled out and grass seed planted. I am also looking at putting a foot path between the shed and house and also putting a soak hole in the ground to take run off from the new driveway . Small digger and truck will be required Quotes required. Thanks
Workmanship |
4.0
|
Cost |
3.0
|
Schedule |
4.0
|
Communications |
5.0
|
Communication great and work was completed within time lines and to a good standard.
Work carried out by the owner/operator
Reviewed on 07-02-2022
Partner with Builderscrack
Get work