Need my front yard leveled ready for lawn. Back yard needs the nib wall removed and the soil inside removed, concrete path around it removed. A concrete pad laid for the wood shed. Then leveled ready for lawn. You can see in the picture there is a deck to be built against the house with a garden also marked against the fence.
#1 | Tradie 1 |
|
85 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 5 jobs | No longer in contact |
#3 | Tradie 3 |
|
75 jobs | No longer in contact |
#4 | Tradie 4 |
|
66 jobs | No longer in contact |
#5 | Tradie 5 |
|
46 jobs | No longer in contact |
Partner with Builderscrack
Get work