Required: Correct disparities in level between lawn to new concrete path. Heights too high at end. Whole length was level prior to new path installation. Need relaying soil/seed on patches where dandelions sprayed. Correct area at end where weeds sprayed, top up soil from back not screened for stones so needs some stones removal and soil top up to correct level. Repairable or start again?
#1 | Tradie 1 |
|
376 jobs | Secured job |
#2 | Tradie 2 | No recent reviews | 35 jobs | No longer in contact |
#3 | Tradie 3 |
|
122 jobs | No longer in contact |
Partner with Builderscrack
Get work