somewhere between 10 and 15 sq metres. i have a video file that explains the task but this site does not let me upload it. the bedroom extension is complete and i want the bricks relaid for the walk way. some of the base is nearly prepared and some needs a little leveling and then base course placed. then the bricks placed.
#1 | Tradie 1 |
|
15 jobs | No longer in contact |
#2 | Tradie 2 |
|
66 jobs | No longer in contact |
#3 | Tradie 3 | Not reviewed | 0 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 3 jobs | No longer in contact |
Partner with Builderscrack
Get work