Published on 18th March 2026
1 ) Build 2.3m x 3.2m hard base for trampoline (or maybe sleepout). Needs to be leveled to old path by front fence.
2 ) rear patio. 2.5 m x 1.6m patio area at rear of house.
3 ) BBQ pad. 2.0m x 1.6m hard pad for BBQ.
4 ) supply 60cm square paver and food grade water butt with tap. Connect water butt to downpipe.Water butt approx --- l, to fit on paver (approx 60x60 or 60cm diameter)
If you do decks, I have posted another job
| Quality of work |
4.0
|
The quality of workmanship provided |
| Cost |
5.0
|
How well they kept to the quoted cost |
| Schedule |
4.0
|
How well they kept to schedule |
| Communications |
5.0
|
Their professionalism and responsiveness |
"Initial work came with issues - 1 pad sloping too much and a driveway fence was clipped. Matt owned these issues and sorted them out. Finished work is good and issues resolved."
Work carried out by the owner/operator
Review posted by Alex on 6th May 2026
Verified work review