We require a retaining frame for a levelled bark area. The land is sloped so the flattened area will be for a trampoline/jungle gym etc. There used to be framing so some of the work has been done. I've included a photo of what it used to look like, and what it currently looks like. Roughly 5m x 4m. We require this done in the next 5 days, so please only respond if this is possible. Thanks
Workmanship |
5.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 09-03-2022
Tradesperson reply
"Thanks, great friendly client who knew what he wanted."
Partner with Builderscrack
Get work