We have an asphalt driveway we'd like to remove. There is asphalt over Gap40, overall it's about 120mm thick. There is around 100m2 total. You will need to rip up the asphalt, dig to the bottom of the metal, remove the material from site and truck it to a dump site. Please provide an estimate based on these details and we'll be in touch.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 10-09-2013
Tradesperson reply
"Thank you Brad for the wonderful comments. You have been great to deal with."
Partner with Builderscrack
Get work