I require the ground surface to be levelled, possibly requiring additional soil. I want to discuss the options of a seeded lawn and /or ready turf. This job is ready to be started as soon as possible, within the next two weeks.
#1 | Tradie 1 |
|
250 jobs | No longer in contact |
#2 | Tradie 2 |
|
115 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 0 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 43 jobs | No longer in contact |
Partner with Builderscrack
Get work