Active job

Dig out last part of a trench - around 1 cube

Job description

Landscape Design
Auckland

I have run out of spare time on a waterproofing project at my house, and hope some one can help. I have a last part of a trench to dig our (it was all done but a recent downpour caved it in. its only about 3-4 meters in length and maybe couple of feet deep (max). But its heavy clay and in a tricky spot. pleanty of room for the dirt to be left. Possibly get you to finish off the water proofing also I have all materials I need it spade and shovel dug down to the footing Apply the water proofing apply poly done... looking for an hourly rate, thats reasonable - happy for job to be viewed first - we are in Ellerslie.


Trade professionals

#1 Tradie 1 No recent reviews 0 jobs No longer in contact
#2 Tradie 2 No recent reviews 32 jobs No longer in contact
#3 Tradie 3 No recent reviews 37 jobs No longer in contact
#4 Tradie 4 No recent reviews 1 job No longer in contact
#5 Tradie 5 No recent reviews 20 jobs No longer in contact
#6 Tradie 6 No recent reviews 0 jobs No longer in contact
#7 Tradie 7 No recent reviews 19 jobs No longer in contact
#8 Tradie 8 Not reviewed 0 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo