I have decided my DIY skills are not enough to complete an upgrade. I have brought a pump, installed main water feed line but I need to have someone: 1. Commission Tivoli pump 2. Cut and install a few 90deg bends in main water feed pipe 3. Integrate new feed pipe into existing box of solenoids and tidy up all the existing outlets. Feels like 1 to 2 to day job. So basically I am too busy to finish this job and just need a good allrounder to pick up the various pieces and tidy it all up please.
Workmanship |
3.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
4.0
|
Work carried out by the owner/operator
Reviewed on 26-07-2021
Partner with Builderscrack
Get work