Need underfloor insulation for the 90sqm house. The basement is accessible.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
The floor insulation was done perfectly. It took only half day to do.
Work carried out by the owner/operator
Reviewed on 26-10-2020
Tradesperson reply
"Thank you for the opportunity guys.. It was great dealing with you."
#1 | Tradie 1 |
|
9 jobs | Secured job |
#2 | Tradie 2 |
|
27 jobs | No longer in contact |
#3 | Tradie 3 |
|
63 jobs | No longer in contact |
#4 | Tradie 4 |
|
146 jobs | No longer in contact |
#5 | Tradie 5 |
|
26 jobs | No longer in contact |
#6 | Tradie 6 |
|
24 jobs | No longer in contact |
Partner with Builderscrack
Get work