Need underfloor insulation installed. 1960s home, 111m2, standard underfloor clearance, insulation is greenstuff underfloor (like pink batts but polyster) just needs stapling up between joists. Timeframe: hopefully done sooner rather than later, but ideally before mid Feb.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Very professional and polite, there the next day, all done in a day and tidied up after themselves, and took away the rubbish. Very happy.
Work carried out by an employee of the company
Reviewed on 29-01-2020
Partner with Builderscrack
Get work