We have 1 bedroom to wall paper, must be completed before 20th October. Has been striped of old paper so ready to go now. There is 16 metres of wall total at 2.4m stud however there is a ranch slider and 1 double opening Sach window deduct from this. We are in Maungaturoto, the job can be done any day except Sunday.
Partner with Builderscrack
Get work