Supply? and fit expol under house insulation. House built 1975. Remove existing sheets of foil in part of area. Area maybe 7m x 10m. Would really like to deal with people who have experience only.
Workmanship |
4.0
|
Cost |
4.0
|
Schedule |
3.0
|
Communications |
4.0
|
Did not have access to material so delay was annoying.
Work carried out by the owner/operator
Reviewed on 14-07-2018
Tradesperson reply
"During winter there can be a waiting period of 3 weeks or so to have your insulation installed. Ross had his underfloor insulation installed just over two weeks after accepting the quote."
Partner with Builderscrack
Get work