Published on 30 May 2025
Property 1 : Karori 1) Remove existing smaller heat pump 2) Replace with a new 9kw heat pump (to be supplied) Property 2: Churton Park 3) Re-install smaller heat pump from (1) above. Both locations for heat pump(s) are on the ground floor and can be accessible via ladder, etc.
Partner with Builderscrack
Get work