Currently have a brand new carrier heat pump that needs to be installed. Wall unit to be placed on the left side of the building. The external unit is to be placed near the chair. Power box is on the right hand side of the building in the garage.
#1 | Tradie 1 |
|
226 jobs | No longer in contact |
#2 | Tradie 2 |
|
72 jobs | No longer in contact |
#3 | Tradie 3 |
|
46 jobs | No longer in contact |
#4 | Tradie 4 |
|
17 jobs | No longer in contact |
#5 | Tradie 5 |
|
50 jobs | No longer in contact |
Partner with Builderscrack
Get work