A free standing wood burner to be dismantled excluding the chimney (so that it can be put back if we change our mind later). So, we want to remove only the wood burner and the pipe that goes to ceiling. We then need to close the ceiling hole with suitable ceiling board.Needs to be done by Monday 7 September 2020. The tile base for the wood burner on the floor is also to be removed. We will take care of dumping any waste material. The mentioned expected cost is a placeholder only.
Partner with Builderscrack
Get work