Install client supplied log burner on existing hearth. (spec TBC confirmed but similar to Tarras / Woodsman). Install client supplied flu (Note double height skillion ceiling and step roof). Connect new log burner wet back to existing hot water cylinder. Disconnect existing solar hot water system from same hot water cylinder (TBC onsite)
Partner with Builderscrack
Get work