I do not use my Jetmaster fire, so would like to have the flue capped. Access is from a second storey balcony onto a flat section of roof (elevated 2.5m from the deck) so scaffolding would not be required (but this is your decision -upon inspection)
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Ray and Denise were great to deal with. They were both very friendly and easy to work with. I would totally recommend them.
Work carried out by the owner/operator
Reviewed on 12-05-2022
Partner with Builderscrack
Get work