We would like to have a Masport --- Kw leg base log burner installed in Mount Lyford, near Kaikoura. It will need to be bolted down too. The previous free standing (1992) log burner (removed) and flue (still in place) needs replacing. The property is 2 storey. First floor is 2.4m to ceiling, second is 2.7m to a 45 degree angle (steel roof). Can we have a cost for Supply and install? and a rough idea of when the job can be done? Obviously this will need consent and sign off so can the necessary information/documentation be included so we can start and finish this process? Thank you, Kylie
#1 | Tradie 1 | No recent reviews | 211 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 13 jobs | No longer in contact |
Partner with Builderscrack
Get work