Have already purchased a Mitsubishi Heavy Industries Heatpump to replace existing heatpump. As this is no longer operating will need to remove gas before it can be removed. All supports, power, trunking already in place. Will need a new 12.7mm copper gas pipe (approx 4 metres) as existing is 15.8mm. The existing 6.35mm liquid pipe may be OK?? Timing - to do asap preferably by end April. I can help with any heavy lifting.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Baden did a perfect job with minimum fuss. He came within a short time span which was great. Really pleased to recommend Baden to any potential clients.
Work carried out by the owner/operator
Reviewed on 28-04-2022
Tradesperson reply
"Thanks Richard, was a pleasure working for you, cheers Baden :)"