We have had a small demo done and I have about a high sided trailer load to be removed.- would fit easily if you cut up some of the kitchen units. Also want carpet ripped up and vinyl removed. I think it’s 4-5 hours work - the whole place is only 50 sq metres. Access via a short path but it can be passed through the fence to save walking up and down. Pics show pile of debris from both sides
#1 | Tradie 1 |
|
1 job | No longer in contact |
#2 | Tradie 2 |
|
2 jobs | No longer in contact |
Partner with Builderscrack
Get work