I have about a 4 m length of folded stainless steel to be attached to a wall at about 3 metres high. It needs to be bolted in at the ends and also steadied with liquid nails or similar. I have the materials, tools and a couple of ladders. It needs 2 or 3 people to hold it in place to locate where the holes for dynabooks go then to hold it while it is put in place.
Workmanship |
5.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
5.0
|
A non-standard job was well thought out
Work carried out by the owner/operator
Reviewed on 11-09-2019
#1 | Tradie 1 |
|
351 jobs | Secured job |
#2 | Tradie 2 |
|
296 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 2 jobs | No longer in contact |
Partner with Builderscrack
Get work