Published on 22nd August 2017
Demolition of chimney and quite a large fireplace on single storey dwelling. Patch colorsteel roof, installing roof/ceiling, wall and floor framing in void left by fireplace. Gib and stop wall and patch timber floor is possible (not essential). Salvage existing scotia and skirting to be re-fixed. Length of new wall required approx 1600mm, ceiling and floor make good approx 1600x1400mm
| Quality of work |
5.0
|
The quality of workmanship provided |
| Cost |
5.0
|
How well they kept to the quoted cost |
| Schedule |
5.0
|
How well they kept to schedule |
| Communications |
5.0
|
Their professionalism and responsiveness |
"Really happy with everything, good communication, didn't claim any extra costs, work carried out in a reasonable time frame and in a professional manner. Would happily use them again"
Work carried out by the owner/operator
Review posted by Ryan on 31st October 2017
"Thanks for the review. We are happy the clients are pleased. Nice people to work for."