We need the Swing Set to be installed and a bit of concrete around the legs. Attached is Specifications of the Swing Set & photos from Website. We would also like it to be stained. We expect the swing set to arrive by end of next week (Friday 29th) and would love it to be up as soon as possible.
Workmanship |
4.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
4.0
|
Work carried out by the owner/operator
Reviewed on 08-09-2022
#1 | Tradie 1 |
|
32 jobs | Secured job |
#2 | Tradie 2 |
|
24 jobs | No longer in contact |
#3 | Tradie 3 |
|
3 jobs | No longer in contact |
Partner with Builderscrack
Get work