The floor of the existing shower is cracked. We need a new floor and I understand this means a new shower.
Workmanship |
4.0
|
Cost |
4.0
|
Schedule |
4.0
|
Communications |
5.0
|
Very satisfied with Stuarts work. He found some extra work that needed to be done before the shower could be built, and gave me an additional estimate for this which was kept to. Very friendly and quite experienced.
Work carried out by the owner/operator
Reviewed on 06-11-2019
Tradesperson reply
"Great customer,listened to my suggestions as to a remedy as the shower tray had been badly installed initially which created the problem,good result & very prompt payment cheers Bill"
Partner with Builderscrack
Get work