Installing underfloor insulation which requires our man-hole to be extended. A small section of flooring needs to be cut away to allow the product to be fed into subfloor (300x450mm). See annotated pictures below.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Ross was excellent to work with for the following reasons: - Good communication before job. - Turned up to the job early, seemed organised with all the tools/materials needed. - Had a ‘can-do’ attitude, good trouble-shooting. - Although it was a fairly straightforward task, I’m happy with the end result. - Reasonably priced, was transparent with expected costs when quoting and invoicing. I felt I knew what I was paying for.
Work carried out by an employee of the company