My power support board that holds the power lines inlet onto the front of the house needs replacing. New board needed, bout 3/4 meter, painted, holes drilled for power lines to go through, then replaced back onto the front of the house near roof. You will need to work with the power company Maridian to switch the power off and bring lines down while job done, then switch power back on. Not a big job but time consuming.
Workmanship |
5.0
|
Cost |
4.0
|
Schedule |
4.0
|
Communications |
4.0
|
good job, nice people
Work carried out by the owner/operator
Reviewed on 21-10-2013
Partner with Builderscrack
Get work