Job must be done tomorrow- Tue 26 oct 3 jobs as part of the same job in a basement bedroom ensuite area. 1. Remove floor tiles in about a 2 m2 area. As per picture 2. Remove remaining framing in preparation for a new frame up. As per picture 3. Cap off the plumbing in same bathroom area. Toilet' hand basin and laundry area so these can can be removed
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Once again another professional, well executed job done with urgency. A+++++
Work carried out by the owner/operator
Reviewed on 09-11-2021
Tradesperson reply
"Thank you so much for the review.
Regards,
Paul Gehlen"
Partner with Builderscrack
Get work