Published on 2nd February 2026
Property is a 2013 build. Issues include significant rust on corner soakers, protruding/rusted nails, and paint degradation. Rust staining is visible at several junctions.
Scope of Work:
- House wash (optional): Preferably include a professional Soft Wash; if not provided, I can arrange this separately.
- Soakers: Replace all rusted soakers.
- Fixings: Extract popped/rusted nails and replace new nails.
- Timber Check: Inspect framing/junctions for moisture/rot while soakers are removed.
- Sealing: Re-caulk junctions and joinery with high-quality sealant (e.g., Sikaflex).
- Painting: Full external repaint
| Quality of work |
5.0
|
The quality of workmanship provided |
| Cost |
5.0
|
How well they kept to the quoted cost |
| Schedule |
5.0
|
How well they kept to schedule |
| Communications |
5.0
|
Their professionalism and responsiveness |
"Jarrod's team completed the project on schedule, within budget, and to a high standard. Communication was great throughout."
Work carried out by the owner & subcontractors
Review posted by Sophia on 24th June 2026
"Thanks Sophie you were great to work with."
24th June 2026
Verified work review
Partner with Builderscrack
Get work