Review

New gas and water line to Sleepout

Job image
Job image

Job description

Gasfitting Cambridge, Waipa

Published on 30th July 2025

Connect up and install an infinity Gas hot water system to the existing new plumbing in a garage Sleepout. Run a feed line for both the water and gas from the main house.


Get connected now with NZ’s largest trade professional network

Get started