We bought a new wok bench to replace old one. The old one is stand along with no water as shown in the photo. The new one need water supply and drain. We also have a sink bench for washing. So the sink bench need to be removed, the put the new wok bench. We have no space put the LPG cylinders outside. We have to use a 9kg gas bottle to connect the new wok bench. Gas fitting job for that is required as well.
#1 | Tradie 1 | No recent reviews | 1 job | No longer in contact |
#2 | Tradie 2 | No recent reviews | 211 jobs | No longer in contact |
Partner with Builderscrack
Get work