Review

Fit gas hob

Job description

Stoves, Ovens & Appliances
North Shore

we have an existing gas hob which will be replaced by a new hob. The new hob connection is 100mm away from the existing connection. The access is awkward and the kitchen people suggest that the fitter installs the pipe before the benchtop is fitted then the fitter returns to complete the connection when the hob and benchtop are placed. We are expecting the benchtop to be installed in the week starting 13th. The cabinets should be in place by 30 October We need the regulator to be replaced at the same time pls


Review

Workmanship
5.0
Cost
5.0
Schedule
5.0
Communications
5.0

Well pleased with job - fast, punctual, professional

Work carried out by the owner/operator
Reviewed on 10-12-2017

Verified Builderscrack review

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo