Active job

Gas hook up

Job description

Gasfitting
Matamata-Piako

The gas fitter I had lined up is very unreliable and I am on a time frame to get my gas set up/hooked up by approximately 24 October. It is a new build and everything should all be piped in through the walls - it is just the last stage of setting it up, getting it working that needs to be done. Sorry I can't be more specific than that, as I don't really know what I am talking about! I just know I need to "get my gas hooked up". I would be so grateful if you could help me achieve my deadline to make this happen.


Trade professionals

#1 Tradie 1
36 jobs No longer in contact
#2 Tradie 2
189 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo