Review

new kitchen and hot water

Job description

Stoves, Ovens & Appliances
Hamilton

I am putting in a new kitchen and need a gas nob connected to gas. There is existing gas lines from the gas heaters to be removed and gas hot water califont to be installed.


Review

Workmanship
5.0
Cost
5.0
Schedule
5.0
Communications
5.0

Matt did a great job he was on time and very efficient. He took less time than I had thought it would take to complete the work. The only delay was because I had not arranged to have the gas meter connected on time.

Work carried out by the owner/operator
Reviewed on 05-01-2019

Verified Builderscrack review

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo