i'm wanting to upgrade from a low pressure cylinder to gas hot water via a 24-26L cailfont with two 45kgs bottles. The plumbing is easy to access. i'm wanting the job quoted but i'm also wanting the job completed asap.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 14-07-2020
Partner with Builderscrack
Get work